Nordroy Turbine
24/7 Port Call & Emergency Squads
Emergency Flying Squad American Bureau of Shipping (ABS) Certified Successfully Dispatched & Completed

Emergency Anchorage Flying Squad Turbocharger Cartridge Swap

Rapid boarding at outer anchorage via offshore tug to replace wrecked turbocharger cartridge at sea

Engineering Documentation Video
Watch on YouTube
Project ID: EMERGENC-2024 • Location: Outer Anchorage (Deep Sea Anchorage, Bay of Bengal)
Client: Mediterranean Bulk Logistics Corp.

Project Overview & Operational Context

While waiting for anchorage lightering, an ocean-going bulk carrier reported catastrophic lubrication loss in its ABB TPL 77-B turbocharger, resulting in seized shaft bearings and smoke in the engine casing. Nordroy Flying Squad was mobilized in under 3 hours.

Engineering Performance Metrics

170 Mins

Dispatch Mobilization

Squad departed port base within 3 hours of SOS call

19.5 Hours

Total At-Sea Work

Complete cartridge extraction & swap at anchorage

$90,000+

Demurrage Saved

Avoided emergency towing and port berth penalties

Zero Incidents

Safety Record

Safe heavy rigging under rough sea conditions

The Engineering Challenge

Performing heavy mechanical rigging and precision micro-clearance assembly in choppy 2.5m swells at deep anchorage without access to shore-based cranes or workshop facilities.

Engineered Remediation

A certified 5-person technical flying squad boarded the vessel with a pre-assembled, factory-balanced replacement cartridge. Using temporary chain hoists and onboard gantry systems, the seized unit was swapped, lube lines flushed, and main engine load tested successfully within 22 hours.

Scope of Technical Work & Overhaul Steps

  • Emergency dispatch of 5-member DNV-certified marine engineering flying squad
  • Boarding via offshore crew transfer vessel in deep anchorage
  • Rigging and extraction of 1.8-ton seized cartridge assembly inside engine room
  • Ultrasonic cleaning and high-pressure chemical flushing of lubricating oil lines
  • Installation of factory-balanced OEM replacement cartridge
  • Cold cranking test, hot bearing temperature monitoring, and sea-trial sign-off

Photographic Documentation

Click photo to enlarge
Project Photo 1
View Photo →
Project Photo 2
View Photo →
Project Photo 3
View Photo →
Project Photo 4
View Photo →

Project Specifications

2024
Client
Mediterranean Bulk Logistics Corp.
Location / Port
Outer Anchorage (Deep Sea Anchorage, Bay of Bengal)
Industry Sector
Deep-Sea Bulk Cargo
Equipment Rating
ABB TPL 77-B Marine Turbocharger Unit
Execution Window
24-Hour Emergency Response Squad
Classification
American Bureau of Shipping (ABS) Certified
Project Status
Successfully Dispatched & Completed
24/7 Port Call Squad

Need Urgent Flying Squad or Dynamic Balancing?

Our mobile engineering squads mobilize within 2-4 hours for maritime anchorage and industrial plants across Bangladesh and Southeast Asia.

Portfolio

Other Featured Case Studies

View All Projects →
Marine Vessel Turbocharger Overhaul & High-Speed Dynamic Balancing
Marine Turbocharger Overhaul

Marine Vessel Turbocharger Overhaul & High-Speed Dynamic Balancing

Complete turbocharger refit, ultrasonic cleaning, and rotor balancing for 85,000 DWT Container Carrier

Chittagong Port & Outer Anchorage View Case Study →
2.5MW Industrial Power Plant Turbocharger Refit & Overhaul
Industrial Captive Power

2.5MW Industrial Power Plant Turbocharger Refit & Overhaul

Continuous heavy-duty turbine overhaul and compressor cartridge overhaul for heavy manufacturing plant

Gazipur Industrial Belt, Bangladesh View Case Study →